$500 off a 200-amp panel upgrade·CSLB #1084610 (C-10)·Family-Owned Since 2021
Serving South Orange County  (949) 799-2034
The Panel Pros of OC by All Thingz Electric
Panel Replacement

Electrical Panel Replacement in South Orange County

If your panel is overheating, corroded, or an old fire hazard brand like Federal Pacific or Zinsco, we swap it out fast and to code. Flat-rate written quote, most jobs finished in a single day.

Electrician replacing an unsafe electrical panel at a South Orange County home
Flat-rate quotein writing, before any work
Done in a daymost 200-amp upgrades
Permit + SCEwe pull it and handle the meter release
Financingwith approved credit
$500 offa 200-amp panel upgrade
The Panel Pros

What an Electrical Panel Replacement Is

Panel replacement means we remove your existing main service panel and install a brand new one, because the panel itself has become unsafe or obsolete. That is different from a simple repair, where one part is swapped out, and different from an upgrade, where we also raise your capacity. Panels are all we do at The Panel Pros, so if yours is showing heat damage, rust, or it is an old hazard brand, we tell you straight whether it needs to come out and exactly what that costs.

Electrician replacing an unsafe electrical panel at a South Orange County home
What you get

What an Electrical Panel Replacement Includes

Every panel replacement is handled end to end, so here is what a standard job includes

New main service panel

We install a new load center sized to your home with all new breakers, properly torqued and labeled.

Updated meter and service entrance

We replace the meter socket or meter-main and the service entrance conductors when the existing ones are undersized or damaged.

Grounding and bonding to current code

We separate the ground and neutral and bring the grounding electrode system, including ground rods or a Ufer connection, up to current code.

Required surge protection

When we replace the service equipment, current code calls for whole-home surge protection, and we include the proper device on the new panel.

Permit and inspection handled

We pull the electrical permit in your city, call in the inspection, and meet the inspector so you do not have to chase paperwork.

SCE meter release coordinated

We schedule the Southern California Edison disconnect and reconnect around the work and handle the timing so power is back on the same day for most jobs.

Want a real number for your panel?

Book a free on-site assessment. We give you a flat-rate price in writing, with no obligation.

or call (949) 799-2034

Signs You Need an Electrical Panel Replacement

A panel usually needs full replacement, not just a repair, when you see signs like these

  • Scorching, charring, or melted plastic inside the panel
  • A burning or ozone smell near the panel
  • Rust, corrosion, or water stains on the bus bars or main lugs
  • An old Federal Pacific, Zinsco, Sylvania, Challenger, or Pushmatic panel
  • A fuse box instead of breakers
  • A panel that is 25 to 40 years old or older
  • Breakers that no longer trip or are no longer manufactured
  • Your insurer flagged the panel or will not renew the policy
Handled for you in South OC

Permits, Inspection, and the SCE Meter Release

South Orange County is entirely Southern California Edison territory, and we know exactly how SCE handles the meter release. A panel swap means the power has to be cut at the meter, the old panel removed, the new one installed, and the meter re-energized once your city signs off. One detail trips a lot of homeowners up, so we set the expectation early. SCE will not act on an electrician's request to unlock or reconnect the meter. The account holder, meaning you, has to place the disconnect and reconnect request with SCE directly. We coordinate the entire schedule and paperwork around it, you just make that one account-level call, and we handle the rest.

The permit and inspection run through your city, not the utility. We pull the electrical permit through your local building department in Mission Viejo, Lake Forest, Aliso Viejo, Laguna Niguel, Dana Point, San Clemente, San Juan Capistrano, Rancho Santa Margarita, and the surrounding South OC cities, and unincorporated areas go through OC Development Services. In Orange County only a licensed contractor or an owner-builder can pull a panel permit, and residential electrical permit fees commonly run somewhere around fifty to two hundred dollars depending on the city. After the install, the inspector verifies the work, we show the SCE confirmation, and the meter is released.

Much of the older South OC housing stock was built in the 1960s through the 1980s, which is exactly the era of Federal Pacific, Zinsco, and fuse panels, and a lot of those homes are now running 100-amp service that an EV charger or a heat pump has maxed out. If your panel is on that list, our guide on why insurers flag FPE and Zinsco panels walks through the insurance and resale side of why replacement matters beyond fire safety.

Permit and inspection paperwork on a finished South OC panel job
Step by step

How an Electrical Panel Replacement Works

Free on-site assessment

We come out, look at the panel, the meter, the service, and your load, and confirm whether you truly need a replacement or something smaller.

Flat-rate quote in writing

You get a clear written price for the full scope before any work starts, with no hourly surprises.

Permit pulled in your city

We pull the electrical permit through your local building department and line up the SCE meter release schedule.

Panel replaced in a day

For most standard jobs we cut power, swap the panel, ground and bond to code, and re-energize the same day.

Inspection and final sign-off

We call in the city inspection, meet the inspector, and confirm the SCE reconnect so everything is closed out and to code.

What an Electrical Panel Replacement Costs

Typical South OC range$2,500 to $6,000

Most standard panel replacements in South Orange County land in this range, while complex jobs with underground service, trenching, or a relocation can run higher, and the only number that truly matters is the free flat-rate quote we put in writing after we see your setup.

  • Panel size and amperage, since 200-amp and 400-amp services need heavier conductors and breakers
  • Overhead versus underground service, where underground trenching and conduit cost far more
  • Whether the meter socket or meter-main combo also needs replacing
  • Panel relocation, which adds roughly $1,000 to $3,000 for rewiring and patching
  • Drywall and stucco patching and other wall finish work
  • Long conductor runs or tight side-yard access
  • Grounding, bonding, and required surge protection upgrades
  • Any added sub-panels, EV charger, or solar tie-in work
We offer financing on panel replacements, and right now there is $500 off a 200-amp upgrade if your replacement also raises your capacity, so ask about it on your free quote.
C-10 Licensed & Insured
CSLB #1084610
Family-Owned & Operated
panels are all we do
5.0 Google Rating
from South OC homeowners
South Orange County
SCE territory specialists

Frequently Asked Questions

How do I know if my panel needs replacement instead of just a repair

If the panel itself is damaged or obsolete, it has to be replaced, not repaired. Replacement is required when you see overheating signs like scorching or melted plastic, rust or corrosion on the bus bars, a fuse box or a hazard brand like Federal Pacific or Zinsco, or a panel that is past the typical 25 to 40 year service life. A repair only makes sense when the panel is a modern, safe brand in sound condition and just needs one part swapped. We tell you which one you actually need at the free assessment, and our guide to the warning signs of a failing panel covers what to watch for.

Are Federal Pacific and Zinsco panels actually recalled

No, neither one was ever formally recalled, and that is a common myth. What is true is that both are widely recognized as fire hazards and are flagged by inspectors and insurers. Federal Pacific Stab-Lok breakers have a documented history of failing to trip, and Zinsco breakers can melt and fuse to the bus bar so they keep passing current even when switched off. There is no reliable repair for either, so the fix is full replacement. You can read more in our insurance risk guide.

How long does a panel replacement take

For most standard replacements we finish in a single day, commonly eight to ten working hours, including cutting power, installing the new panel, grounding and bonding to code, and getting power back on. Complex jobs that involve panel relocation, underground service, or a service mast rebuild can run two to four days, and we tell you the expected timeline in your written quote.

Who handles the SCE meter and the city permit

We do almost all of it. We pull the electrical permit in your city, schedule the work, call in the inspection, and coordinate the Southern California Edison disconnect and reconnect. The one part only you can do is the SCE request itself, because SCE only acts on the account holder's request to disconnect or reconnect the meter. You place that call, we handle the timing and paperwork around it, and you are not left chasing the utility.

Will replacing my panel help with insurance or selling my home

Often yes. Many insurers now refuse to write or renew a homeowners policy on a home with a Federal Pacific or Zinsco panel, or they require proof of replacement first, and a home that is hard to insure is also harder to mortgage and sell. Replacing the panel removes that obstacle. If your insurer flagged your panel or you are getting ready to list, we replace it fast and to code so you have clean documentation.

Do I need a full replacement or just more capacity

It depends on why the panel is coming out. If the panel is unsafe or obsolete, you need a replacement even if the capacity stays the same. If the panel is fine but simply maxed out from an EV charger, a heat pump, or an addition, that is an upgrade, most commonly a 100-amp to 200-amp upgrade. Many homes need both at once, an old panel replaced and the service raised, and we size all of it correctly at the free assessment.

Not Sure Where Your Panel Stands?

Take the free Panel Health Check and see what your answers point to in about two minutes. No pressure, and you can text us a photo to verify what you have.

Take the Panel Health Check
Claim your $500 off a 200-amp upgrade

Get a Straight Answer on Your Panel. Free.

Tell us what your panel is doing. We take a look, give you a flat-rate price in writing, and tell you honestly whether it needs to happen now. No pressure, no obligation.

Call (949) 799-2034
✓ C-10 Licensed & Insured✓ Family-Owned & Operated✓ Most upgrades done in one day